Description
DDP Ford 99-03 7.3L Stage 2 Injector Set (25% Over) *With Long Lead*
Product Features:
Air Freight Prohibited: false
Not Carb Approved: true
Ltl Freight Required: false
Prop 65: Unknown
Epa: N/A
Carb Acknowledgement Required: t
Original price was: £3,230.75.£220.33Current price is: £220.33.
DDP Ford 99-03 7.3L Stage 2 Injector Set (25% Over) *With Long Lead*
Product Features:
Air Freight Prohibited: false
Not Carb Approved: true
Ltl Freight Required: false
Prop 65: Unknown
Epa: N/A
Carb Acknowledgement Required: t
Reviews
There are no reviews yet.